Monday, September 15, 2008
Sunday, September 7, 2008
Floor Work Continues
Cliff continues to work on the floor. He has primer, sealed seams and painted a top coat with enamel paint on the underside of the floor. Presently, the floor frame work is resting on the metal frame. The next steps will be bolting the floor to the metal frame, placing insulation in between braces, installing top flooring and laying down the congoleum.
Tuesday, September 2, 2008
Working the Floor